    Default Re: Renewable con job

    Reply from Germany.

    Q. why does the Pedestal need to be replaced? Surely there is some kind of fabric maintenance carried out during a Turbines service life. I can understand the need to replace the Turbine unit and perhaps the blades.

    A. The windmill as a whole is a very complex system. Everything is precisely coordinated. When you replace the turbine - let's say after 20 years- other/ better turbines are state of the art. In such a complex system, it's impossible to replace just a part. Imagine you want to replace the gearbox of your 20-year-old car with a gearbox of a modern car. Maybe a tinkerer can do it, but not on an industrial scale. In the gearbox example, not only the screw holes won't fit. The problems are much deeper. There are different rotations per minute, different torque, parts are subject to material aging and so on.



    Q. I read an article that a German/Spanish company Siemens Gamsea have designed a blade that is now possible to recycle at the end of its serviceable life. The new Blades are to enter service this year and are made in Denmark.

    A. I heard something, but sorry, not in detail.


    Q. Also, in Germany they are bringing back online again Coal fired power stations that had been mothballed this is due to the sanctions imposed against Russia because of the war in Ukraine.

    A. Yes, Russia's war in Ukraine is the reason. It is impossible to build so many windmill and solar fields in such a short time. We have to use what's there at the moment.

    Cheers, Rodney

  2. Thanks James Curry thanked for this post
  3. #12
    Join Date
    Mar 2022
    Location
    Prenton
    Posts
    2,772
    Thanks (Given)
    343
    Thanks (Received)
    1210
    Likes (Given)
    2237
    Likes (Received)
    3917

    Default Re: Renewable con job

    Thanks Rodney for taking the time to get the information.
    James.

  4. Thanks Rodney Mills thanked for this post
    Likes Denis O'Shea liked this post
  5. #13
    Join Date
    Nov 2017
    Location
    CHESTER LE STREET
    Posts
    2,326
    Thanks (Given)
    699
    Thanks (Received)
    1255
    Likes (Given)
    12937
    Likes (Received)
    8310

    Default Re: Renewable con job

    Quote Originally Posted by Rodney Mills View Post
    Reply from Germany.

    Q. why does the Pedestal need to be replaced? Surely there is some kind of fabric maintenance carried out during a Turbines service life. I can understand the need to replace the Turbine unit and perhaps the blades.

    A. The windmill as a whole is a very complex system. Everything is precisely coordinated. When you replace the turbine - let's say after 20 years- other/ better turbines are state of the art. In such a complex system, it's impossible to replace just a part. Imagine you want to replace the gearbox of your 20-year-old car with a gearbox of a modern car. Maybe a tinkerer can do it, but not on an industrial scale. In the gearbox example, not only the screw holes won't fit. The problems are much deeper. There are different rotations per minute, different torque, parts are subject to material aging and so on.



    Q. I read an article that a German/Spanish company Siemens Gamsea have designed a blade that is now possible to recycle at the end of its serviceable life. The new Blades are to enter service this year and are made in Denmark.

    A. I heard something, but sorry, not in detail.


    Q. Also, in Germany they are bringing back online again Coal fired power stations that had been mothballed this is due to the sanctions imposed against Russia because of the war in Ukraine.

    A. Yes, Russia's war in Ukraine is the reason. It is impossible to build so many windmill and solar fields in such a short time. We have to use what's there at the moment.

    Cheers, Rodney
    I retired from work with a novel grp manufacturer just before last Christmas. Some six or seven years ago I investigated recycling of reject materials from our production. Cured grp recycling equipment was available back then but was a high capital expenditure and would take a long time to recoup as we only sent about one skip (8 cubic yards) per month to land fill. At that time we were quoted in the region of £350k for the kit; A non starter for a small company.

  6. Thanks Rodney Mills thanked for this post