Results 1 to 3 of 3

Thread: Glen Rosa

  1. #1
    Join Date
    Mar 2022
    Location
    Prenton
    Posts
    4,003
    Thanks (Given)
    478
    Thanks (Received)
    1926
    Likes (Given)
    3298
    Likes (Received)
    5839
    Blog Entries
    2

    Default Glen Rosa

    Yet another price hike and delay for the Cal Mac ferry Glen Rosa. Someone deserves Jail time over this a national disgrace.
    £35 million required to complete her.

    https://www.bbc.co.uk/news/articles/clywz8pyj76o

  2. Thanks Doc Vernon thanked for this post
  3. #2
    Join Date
    Jun 2022
    Location
    StIves
    Posts
    144
    Thanks (Given)
    16
    Thanks (Received)
    61
    Likes (Given)
    532
    Likes (Received)
    393

    Default Re: Glen Rosa

    This is a National disgrace! But it could be turned around. Cancel the Ferry build and take on a contract from Russia to build ships for their Shadow fleet and “special operation” in Ukraine . This would help the West as nothing would be built and even with cost over runs would cost less than the Latest defence review.it could increase Defence spending to 6% of GDP. It would also get support from the SNP as it would meet all their needs as far a maintaining their Express Gravy Train.
    Just a cynical thought
    Doug

  4. Likes Tony Taylor, John Arton liked this post
  5. #3
    Join Date
    Nov 2017
    Location
    CHESTER LE STREET
    Posts
    2,790
    Thanks (Given)
    768
    Thanks (Received)
    1500
    Likes (Given)
    14765
    Likes (Received)
    9425

    Default Re: Glen Rosa

    thumbnail_PHOTO-2025-07-03-17-17-01.jpg
    Back from refit in Turkey

  6. Likes Des Jenkins, John Arton liked this post

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •